Reopening of the Hood River-White Salmon Interstate Bridge for Passenger Vehicles

The Port Commission approved the reopening of the Hood River-White Salmon Interstate Bridge based on the recommendation from the engineering team at this morning’s special emergency meeting. Justin Doornink, PhD, PE, Associate Vice President and Northwest Region Bridge Leader from HDR Engineering, Inc., advised that the Port limit traffic to passenger vehicles only to prevent another accidental strike to the overhead bracing while the bridge remains in a damaged state.

The bridge is expected to reopen for the use of passenger vehicles only by 2 PM on June 30, 2024. Electronic tolling will be implemented, and traffic control personnel will be stationed at both entrances around the clock to ensure compliance. A schedule for the permanent repairs will be provided later in the week.

Port Commission Meeting Link: https://www.youtube.com/watch?v=yrgCBVZrwz0